翻訳と辞書 |
Sinop Nuclear Power Plant : ウィキペディア英語版 | Sinop Nuclear Power Plant
The Sinop Nuclear Power Plant ((トルコ語:Sinop Nükleer Enerji Santrali)) is a planned nuclear plant located at Sinop in northern Turkey. It will be the country's second nuclear power plant after the projected Akkuyu Nuclear Power Plant. The deal for the project on a build-operate-transfer (BOT) basis was signed between Turkish Prime minister Recep Tayyip Erdoğan and his Japanese counterpart Shinzo Abe on May 3, 2013. The project will be carried out by Atmea, a joint venture consortium of Japanese Mitsubishi Heavy Industries and French Areva. Turkey, being geographically on a highly active earthquake-prone zone, relies on top-level safety know-how and experience of Japanese experts against earthquakes. Mitsubishi Heavy Industries and Itochu will build the power plant, which will have a capacity of around 4,480 MWe. Four generation III pressurized water reactors (PWR) of type Atmea I developed by Atmea will be installed in the nuclear plant.〔 French electric utility company GDF Suez will be in charge of the operation of the nuclear plant. It is intended that Turkish Electricity Generation Corporation (EÜAŞ) will have 20-45% shares in the nuclear plant.〔 As of June 2015, the project remains in feasibility study stage, and the total project cost is estimated at approx. $15.8 billion, of which 70% will be debt financed. It is projected that the first unit of Sinop plant will be active by 2023, and the fourth unit enter service by 2028.〔 ==References==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Sinop Nuclear Power Plant」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|